Retail & Inventory

Reorder Point

Combine average lead-time demand with an entered safety-stock buffer.

Your numbers

Sample inputs are illustrative. Changing currency changes labels only.

Your result

Preparing the sample calculation…

Shared links include your entered amounts. Saved scenarios stay in this tab only.

How to use this calculator

  1. Enter average daily demand in units, supplier lead time in days, safety stock in units.
  2. Choose a display currency, then select Calculate. Results also update after a brief pause while you edit.
  3. Read the result with the assumptions below. Export details or save a second scenario to compare your choices.

Formula and method

Reorder point = average daily demand × lead time days + safety stock.

Assumptions and limitations

Demand and lead-time estimates must use the same time basis. The safety buffer is supplied, not inferred.

Worked example

With average daily demand in units = 20, supplier lead time in days = 10, safety stock in units = 50, reorder point in units is approximately 250.

What the result means

This indicates the modeled inventory-position trigger, which may include stock on order less backorders.

Common questions

How should I interpret reorder point in units?

This indicates the modeled inventory-position trigger, which may include stock on order less backorders.

What should I check before using this result?

Demand and lead-time estimates must use the same time basis. The safety buffer is supplied, not inferred.

Methodology and transparency

Calculation specification reviewed on 2026-10-14. Mathematical implementation is tested against independent reference fixtures. This does not imply review by a licensed financial professional. Read the testing and precision policy.